Copyright is owned by the Author of the thesis. Permission is given for a copy to be downloaded by an individual for the purpose of research and private study only. The thesis may not be reproduced elsewhere without the permission of the Author. i Innovative land-use planning for natural hazard risk reduction in New Zealand A thesis presented in partial fulfilment of the requirements for the degree of Doctor of Philosophy in Resource and Environmental Planning at Massey University, Manawatu, New Zealand. Wendy Susan Anne Saunders 2012 ii iii ABSTRACT New Zealand is susceptible to a number of natural hazards, yet some land-use planning decisions can lead to developments being located in at risk locations. This can lead to an increase in risk rather than risk reduction, which does not promote the principles of sustainable development. The aim of this research is to develop a risk- based framework for innovative land-use planning that allows risks from natural hazards in New Zealand to be reduced, and encourages better decision making for natural hazard risk reduction. Research methods employed included Participatory Action Research, a literature review, use of case studies, qualitative content analysis, interviews, and workshops. The conceptual foundation of this research integrates insights from innovation scholarship, natural hazards planning, participatory planning and risk governance. The case studies highlighted that an innovative risk governance approach is required to address the shortfalls of existing risk governance arrangements. The state, market and civil society are key to an integrated risk governance approach; however risk creation, bearing and sharing may not be equal between these players, and economic imperatives often override social and environmental concerns. Barriers to and opportunities for innovation for risk reduction included prevailing governance, leadership, legislation, research, second generation plans, cost, liability, skills/ experience/resources, awareness and understanding. There is a variety of guidance available to local government on various natural hazards. But in order to appropriately manage these hazards the risk must first be quantified and qualified – for which there is limited guidance available. This research bridges this gap by outlining an approach to risk governance that is framed around three key steps: 1) articulating and addressing consequences of events; 2) assessing the likelihood of these consequences; and 3) taking a risk-based approach to planning based on Steps 1 and 2. The result is a planning framework that becomes more restrictive as risk increases. With a focus on risk management principles and processes, the framework assists planners by providing policy and resource consent activity status criteria that enable hazard risks to be categorised via risk-based land- use planning. This provides an alternative to the current planning approach that can be used to assess risk implications within the existing planning system. Planning has a vital role to play in reducing risks from natural hazards, but a new approach is required to ensure that planning decisions do not result in an increase in iv risk to people and property. Legislative changes are needed to ensure consistency, integrate legal provisions and provide effective monitoring of risk reduction policies and outcomes. The risk-based framework presented provides a significantly new approach where consequences are the primary concern, rather than likelihood; and it allows for levels of risk to be defined. The result is a framework that can assist decision makers to reduce risks to people and property from natural hazards, and encourages sustainable development. v PREFACE He aha te mea nui o te ao? He tangata! He tangata! He tangata! What is the most important thing in the world? It is people! It is people! It is people! Māori proverb Don’t build your house on the sandy land Don’t build it too near the shore Oh it might be kind of nice But you’ll have to do it twice And you’ll have to build your house once more You better build your house upon the rock And put a sure foundation on the solid spot And though the storms may come and go Peace of God you’ll know. Children’s Sunday School song vi vii ACKNOWLEDGMENTS This thesis would not have been possible without the support of family, friends, GNS Science, work colleagues, and the Zonta/BRANZ PhD scholarship. This scholarship was invaluable in allowing me to take time away from work to concentrate on aspects of the PhD. This was especially critical during the last couple of months before submission. While the following deserve particular mention (in no particular order), this is in no way an exhaustive list of all those who have provided support along the journey. Supervisors Professor Bruce Glavovic of the Massey University School of People, Environment and Planning Department and the Massey/GNS Science Joint Centre of Disaster Research; and Associate Professor David Johnston, from GNS Science and the Massey/GNS Science Joint Centre of Disaster Research. Thanks to all those colleagues who have been so supportive at GNS Science, way too many to mention here. Particular thanks are required for the following (in no particular order): Chief Executive Officer Alex Malahoff, who was extremely supportive of the PhD journey, and was keen to ensure it happened. Julia Becker – I can’t even start to explain how much support you have provided during this journey! Thanks for being a good listener and sympathiser when the times got tough, I’m looking forward to the future challenges we’ll have together …. Kelvin Berryman, for always having time to stop and go through all my risk questions and framework; Terry Webb for providing feedback on the risk-based approach; Jim Cousins for many discussions on risk; Andrew King; Michele Daly; Hannah Brackley; William Power; Warwick Smith for explaining risk concepts in easy to understand language; Nicolas Pondard, for being a bouncing board for my risk ideas; Phil Glassy; Kim Wright; Maureen Coomer, Graham Leonard; Hamish Campbell for all those words of wisdom(?); Brendan Doody for those Endnote skills; Penny Murray for her great Word skills; Jane Forsyth for taking up the challenge to provide a critical review; Daryl Barton; James Beban (on secondment to GNS Science from Cuttriss Consultants) for ensuring the risk-based approach was practical for planning purposes. To the council staff from Waikato Regional Council, Thames-Coromandel District Council, Bay of Plenty Regional Council and associated territorial authorities, and Gisborne District Council who participated in the workshops which assisted in developing the risk-based approach. In particular, I’d like to thank Peter Wishart from TCDC and Martin Butler from BOPRC for their continued support throughout the viii process; to all those who participated in the interviews – without your support, this results of this thesis would not of been possible; EQC for supporting the research project “New Zealand’s Next Top Model” – this support allowed the risk-based approach to be incorporated into a national guideline for integrating tsunami inundation modelling into land-use planning; and my planning mentor, Hamish Wesney from Boffa Miskell. My family, in particular my husband Gerry, for always believing in me; and my surprise bump, Campbell – thanks for letting me finish this before coming into this world! ix TABLE OF CONTENTS ABSTRACT ............................................................................................................................ iii PREFACE ............................................................................................................................. v ACKNOWLEDGMENTS ............................................................................................................. vii LIST OF FIGURES ..................................................................................................................... xv LIST OF TABLES ..................................................................................................................... xvii ABBREVIATIONS ..................................................................................................................... xix CHAPTER 1 Introduction ........................................................................................................ 1 1. Introduction ......................................................................................................................... 2 2. The New Zealand hazardscape .......................................................................................... 3 3. Rationale for study .............................................................................................................. 7 4. Overarching aim and objectives ......................................................................................... 9 5. Overview of research ........................................................................................................ 10 6. Scope and limitations ........................................................................................................ 12 7. Key concepts of research ................................................................................................. 14 7.1 Sustainable development ..................................................................................... 14 7.2 Risk governance .................................................................................................. 14 7.3 Natural hazard...................................................................................................... 15 7.4 Land-use planning ............................................................................................... 16 7.5 Risk reduction and mitigation ............................................................................... 16 7.6 Risk ...................................................................................................................... 17 7.7 Innovation ............................................................................................................. 17 8. Summary ........................................................................................................................... 18 CHAPTER 2 Theoretical Context ......................................................................................... 19 1. Introduction ....................................................................................................................... 20 2. Sustainable development ................................................................................................. 20 3. Risk governance ............................................................................................................... 22 4. Natural hazards ................................................................................................................. 27 5. Land-use planning ............................................................................................................ 31 6. Risk ................................................................................................................................... 39 6.1 Measuring life safety risk ..................................................................................... 42 6.1.1 Individual risk........................................................................................... 43 6.1.2 Societal risk ............................................................................................. 44 7. Innovation ......................................................................................................................... 45 x 8. Summary ........................................................................................................................... 46 CHAPTER 3 Research design .............................................................................................. 49 1. Introduction ........................................................................................................................ 50 2. Participatory action research (PAR) .................................................................................. 51 2.1 Ethical procedures of approach ............................................................................ 56 3. Review of literature ............................................................................................................ 56 4. The case study – setting the context ................................................................................. 57 4.1 Selection of case study area and subgroups ....................................................... 59 5. Interviews .......................................................................................................................... 63 5.1 Selection of participants for case study interviews ............................................... 63 5.2 Semi-structured questions for case study interviews ........................................... 65 5.3 Interview with Regional Planner, Bay of Plenty Regional Council ....................... 69 6. Qualitative content analysis ............................................................................................... 71 6.1 Computer aided analysis ...................................................................................... 73 6.1.1 Limitations of approach ............................................................................ 74 7. Workshops – development of risk-based approach .......................................................... 75 7.1 Workshop 1........................................................................................................... 75 7.2 Workshop 2........................................................................................................... 76 8. Limitations and opportunities of workshops ...................................................................... 77 9. Implications of research design ......................................................................................... 78 10. Summary ........................................................................................................................... 78 CHAPTER 4 The legislative context for natural hazard management in New Zealand .............................................................................................................. 79 1. Introduction ........................................................................................................................ 80 2. Regulatory context............................................................................................................. 81 2.1 Interpretation of sustainable management and development .............................. 83 2.1.1 Social, economic, environmental, and cultural well-being ....................... 84 2.2 Definitions of natural hazards ............................................................................... 85 2.3 Integrated roles and responsibilities ..................................................................... 86 2.3.1 Canterbury Earthquake Response and Recovery Act ............................. 89 2.4 New Zealand Coastal Policy Statement ............................................................... 90 2.5 Risk reduction and the CDEMA ............................................................................ 91 3. Reconciling avoidance, mitigation, and risk reduction under the RMA ............................. 91 3.1 Kahikatea Estates, Coromandel ........................................................................... 93 4. Planning timeframes for natural hazards .......................................................................... 97 4.1 The influence of the Building Act 2004 on timeframes under the RMA.............. 100 5. The role of the planner .................................................................................................... 101 xi 6. Summary and conclusions .............................................................................................. 105 CHAPTER 5 Innovation and land-use planning: A perspective from Thames- Coromandel .................................................................................................... 107 1. Introduction ..................................................................................................................... 108 2. Types of innovation ......................................................................................................... 109 2.1 Innovation in business ....................................................................................... 109 2.2 Social and community innovation ...................................................................... 111 2.3 Environmental and sustainability innovation ...................................................... 113 2.4 Innovation and risk governance ......................................................................... 114 3. Innovation and land-use planning ................................................................................... 116 4. Case study findings: hazard awareness and innovation in Thames-Coromandel.......... 119 4.1 Awareness of natural hazards in Thames-Coromandel .................................... 119 4.2 Innovation in Thames-Coromandel .................................................................... 123 4.2.1 Insurance ............................................................................................... 124 4.2.2 Peninsula Project .................................................................................. 124 4.2.3 Kahikatea Estate ................................................................................... 125 4.2.4 Whitianga Waterways ........................................................................... 126 4.2.5 Backstop walls....................................................................................... 127 4.3 Opportunities and barriers for innovation in Thames-Coromandel .................... 128 4.3.1 Governance ........................................................................................... 130 4.3.2 Leadership ............................................................................................. 131 4.3.3 Legislation ............................................................................................. 132 4.3.4 Skills/expertise/resourcing .................................................................... 135 4.3.5 Liability .................................................................................................. 136 4.3.6 Cost ....................................................................................................... 137 4.3.7 Awareness and understanding.............................................................. 138 4.3.8 Second generation planning opportunities ............................................ 139 4.3.9 Research ............................................................................................... 140 5. Summary and conclusions .............................................................................................. 140 CHAPTER 6 A risk-based framework for innovative land-use planning for natural hazard risk reduction .................................................................................... 145 1. Introduction ..................................................................................................................... 146 2. Risk governance and management ................................................................................ 147 3. Planning approaches to risk ........................................................................................... 150 3.1 Risk-based approach ......................................................................................... 150 3.2 Precautionary approach ..................................................................................... 151 3.3 Participatory approach ....................................................................................... 153 3.4 Which approach is most appropriate? ............................................................... 154 xii 4. An innovative risk-based approach to land-use planning for natural hazards ................ 157 4.1 The process ........................................................................................................ 158 4.2 Implementation of risk treatment - a risk-based approach ................................. 162 4.2.1 Step 1: Determine the consequences .................................................. 163 4.2.1.1 Scale of impact .................................................................. 163 4.2.1.2 Description of consequences ............................................ 164 4.2.1.3 Severity of consequences ................................................. 166 4.2.1.4 Ranking of consequences ................................................. 168 4.2.2 Step 2: Evaluate the likelihood of an event .......................................... 169 4.2.3 Step 3: Taking a risk-based approach to land-use planning ................ 170 5. Implementation of approach – Bay of Plenty Regional Council ...................................... 174 5.1 Why change was required .................................................................................. 175 5.2 Implementation within the Proposed Regional Policy Statement ....................... 176 5.3 Current status of the proposed RPS .................................................................. 180 6. Limitations and opportunities of approach ...................................................................... 181 7. Summary ......................................................................................................................... 183 CHAPTER 7 Summary and conclusions ........................................................................... 185 1. Introduction ...................................................................................................................... 186 2. Summary of research findings ......................................................................................... 187 2.1 Sustainable development ................................................................................... 187 2.2 Legislative context for natural hazard management in New Zealand ................ 188 2.3 Innovation and land-use planning for natural hazard risk reduction: a perspective from Thames-Coromandel .............................................................. 189 2.4 A risk-based approach to natural hazards and land-use planning ..................... 191 3. Limitations of research .................................................................................................... 192 4. Opportunities for future research ..................................................................................... 193 5. Conclusions ..................................................................................................................... 193 BIBLIOGRAPHY ....................................................................................................................... 213 xiii LIST OF APPENDICES Appendix 1 Massey University Human Ethics Committee approvals ..................... 197 Appendix 2 Managing uncertainty in land-use planning ........................................ 203 Appendix 3 Relevant provisions in the New Zealand Coastal Policy Statement .... 209 xiv xv LIST OF FIGURES Figure 1.1 The New Zealand geological setting (adapted from Glavovic, et al., 2010, p680). ........................................................................................... 4 Figure 2.1 Hierarchy of governance arrangements for natural hazard risk reduction. ............................................................................................. 23 Figure 2.2 Elements of risk governance (left) and inclusive risk governance (right) (Renn, 2008, p365, 367). .......................................................... 26 Figure 2.3 A choice tree of adjustment (Burton, Kates & White, 1993, p58). ......... 28 Figure 2.4 IAP2 Public Participation Spectrum (IAP2). .......................................... 37 Figure 3.1 Multiple case study method (Yin, 2003, p50). ....................................... 58 Figure 3.2 Subgroups within the case study framework ........................................ 60 Figure 4.1 Legislative roles and responsibilities for hazard management in New Zealand (adapted from Saunders, Forsyth, Johnston, & Becker, 2007)....................................................................................... 87 Figure 4.2 The role of the planner in New Zealand within a sustainable land- use planning framework (i.e. natural, social and economic environments) .................................................................................... 102 Figure 5.1 Role of the state, market and civil society in innovative risk governance and their dynamic relationships. ..................................... 116 Figure 5.2 Key linkages between barriers and opportunities to innovative risk reduction within land-use planning. .................................................... 129 Figure 6.1 Three recommended stages for effective governance of risk management (Standards Australia/New Zealand, 2009, pvi). ............. 148 Figure 6.2 Relationship between increasing risk and resource consent status (adapted from Saunders & Glassey, 2007, p49). ................................ 151 Figure 6.3 ALARP principle (DPMC, 2007; Health & Safety Executive, 2001; Standards Australia/New Zealand, 2004; Tonkin & Taylor, 2006)....... 152 Figure 6.4 Risk governance model for land-use planning (based on ISO 3100 (based on Renn, 2008; Standards Australia/New Zealand, 2009; Stern & Fineberg, 1996). .................................................................... 159 Figure 6.5 Recovery groups under the CDEM framework (adapted from MCDEM, 2006, s25 p3). ..................................................................... 165 Figure 6.6 Scale of impact, consequences, and severity of consequence ........... 166 Figure 6.7 Framework for quantifying risk ........................................................... 171 Figure 6.8 Quantification of risk .......................................................................... 171 Figure 6.9 Levels of risk based on Figure 6.8...................................................... 171 Figure 6.10 Colour-coded risk table ...................................................................... 172 Figure 6.11 Qualitative levels of risk based on Figure 6.10 ................................... 172 Figure 6.12 Risk-based approach to land-use planning for natural hazard risk reduction. ........................................................................................... 173 Figure A2.1 Modellers’ and decision-makers’ view on uncertainty (van Asselt, 2000, p91) .......................................................................................... 205 xvi Figure A2.2 Example of uncertainty cones in active fault mapping, with colours depicting type of fault and level of uncertainties (Kerr, et al., 2003). ... 206 Figure A2.3 The Tahunanui Slope Risk Area, commonly known as the Tahunanui Slump, is defined on the Planning Maps within the Nelson Resource Management Plan. ................................................. 207 xvii LIST OF TABLES Table 1.1 Examples of guidance provided for natural hazard management in New Zealand. ......................................................................................... 6 Table 2.1 Risk-based international boundary levels of tolerability for health and safety ............................................................................................ 41 Table 3.1 Three types of participatory action research (Cameron, 2007, p207) ................................................................................................... 52 Table 3.2 Summary of PAR steps employed in this research ............................... 54 Table 3.3 Representatives included in case study research ................................. 61 Table 4.1 Purposes of key legislation for the management of natural hazards (emphasis added). ............................................................................... 82 Table 4.2 Legislative definitions of natural hazards .............................................. 86 Table 4.3 Summary of ways in which statutes contribute to the management of natural hazards ................................................................................ 88 Table 4.4 Comparative land-use planning return periods for selected natural hazards in New Zealand ...................................................................... 99 Table 5.1 Three categories of business innovation (Davila, et al., 2006) with eight types of innovation (based on Sternberg, et al., 2003) and examples of from land-use planning in New Zealand. ........................ 110 Table 5.2 Specific natural hazards included in plans for Thames-Coromandel and responses as being a concern from participants (in percentages, n = 20) .......................................................................... 121 Table 6.1 Choice of approaches for managing risk (based on Klinke and Renn (2002) unless specified). ........................................................... 155 Table 6.2 Decision making issues to be considered of planning options (adapted from Standards New Zealand, 2004, p82) ........................... 156 Table 6.3 Scale of impact definitions (Standards New Zealand, 2004, p54) ....... 164 Table 6.4 Qualitative description of severity of consequences (adapted from Standards Australia/New Zealand, 2002) ........................................... 167 Table 6.5 Likelihood scale (adapted from Standards New Zealand, 2004) ......... 170 xviii xix ABBREVIATIONS 2GP Second generation plans AEP Annual exceedance probability ALARP As low as reasonably practicable AR Action research AS/NZS Australian/New Zealand Standard BOPRC Bay of Plenty Regional Council CAENZ Centre for Advanced Engineering New Zealand CDEM Civil Defence & Emergency Management CDEMA Civil Defence Emergency Management Act 2002 EQC Earthquake Commission EW Environment Waikato IAP2 International Association of Public Participation IBHS Institute for Business and Home Safety ICNZ Insurance Council of New Zealand LIM Land information memorandum LGA Local Government Act 2002 LGNZ Local Government New Zealand LTCCP Long term council community plan MCDEM Ministry of Civil Defence and Emergency Management MfE Ministry for the Environment NZCPS New Zealand Coastal Policy Statement 2010 xx ODESC Office of Domestic and External Security Group PAR Participatory action research RMA Resource Management Act 1991 RPS Regional Policy Statement TCDC Thames-Coromandel District Council WRC Waikato Regional Council