Browsing by Author "Pham, Cao Van"
Now showing 1 - 2 of 2
Results Per Page
Sort Options
- ItemIntegrated and adaptive traffic signal control for diamond interchange : a thesis presented in partial fulfilment of the requirements for the degree of Doctor of Philosophy in Mechatronics Engineering at Massey University, Albany, New Zealand(Massey University, 2017) Pham, Cao VanNew dynamic signal control methods such as fuzzy logic and artificial intelligence developed recently mainly focused on isolated intersection. Adaptive signal control based on fuzzy logic control (FLC) determines the duration and sequence that traffic signal should stay in a certain state, before switching to the next state (Trabia et al. 1999, Pham 2013). The amount of arriving and waiting vehicles are quantized into fuzzy variables and fuzzy rules are used to determine if the duration of the current state should be extended. The fuzzy logic controller showed to be more flexible than fixed controllers and vehicle actuated controllers, allowing traffic to flow more smoothly. The FLC does not possess the ability to handle various uncertainties especially in real world traffic control. Therefore it is not best suited for stochastic nature problems such as traffic signal timing optimization. However, probabilistic logic is the best choice to handle the uncertainties containing both stochastic and fuzzy features (Pappis and Mamdani 1977) Probabilistic fuzzy logic control is developed for the signalised control of a diamond interchange, where the signal phasing, green time extension and ramp metering are decided in response to real time traffic conditions, which aim at improving traffic flows on surface streets and highways. The probabilistic fuzzy logic for diamond interchange (PFLDI) comprises three modules: probabilistic fuzzy phase timing (PFPT) that controls the green time extension process of the current running phase, phase selection (PSL) which decides the next phase based on the pre-setup phase logic by the local transport authority and, probabilistic fuzzy ramp-metering (PFRM) that determines on-ramp metering rate based on traffic conditions of the arterial streets and highways. We used Advanced Interactive Microscopic Simulator for Urban and Non-Urban Network (AIMSUN) software for diamond interchange modeling and performance measure of effectiveness for the PFLDI algorithm. PFLDI was compared with actuated diamond interchange (ADI) control based on ALINEA algorithm and conventional fuzzy logic diamond interchange algorithm (FLDI). Simulation results show that the PFLDI surpasses the traffic actuated and conventional fuzzy models with lower System Total Travel Time, Average Delay and improvements in Downstream Average Speed and Downstream Average Delay. On the other hand, little attention has been given in recent years to the delays experienced by cyclists in urban transport networks. When planning changes to traffic signals or making other network changes, the value of time for cycling trips is rarely considered. The traditional approach to road management has been to only focus on improving the carrying capacity relating to vehicles, with an emphasis on maximising the speed and volume of motorised traffic moving around the network. The problem of cyclist delay has been compounded by the fact that the travel time for cyclists have been lower than those for vehicles, which affects benefit–cost ratios and effectively provides a disincentive to invest in cycling issues compared with other modes. The issue has also been influenced by the way in which traffic signals have been set up and operated. Because the primary stresses on an intersection tend to occur during vehicle (commuter) peaks in the morning and afternoon, intersections tend to be set up and coordinated to allow maximum flow during these peaks. The result is that during off-peak periods there is often spare capacity that is underutilised. Phasing and timings set up for peaks may not provide the optimum benefits during off-peak times. This is particularly important to cyclists during lunch-time peaks, when vehicle volumes are low and cyclist volumes are high. Cyclists can end up waiting long periods of time as a result of poor signal phasing, rather than due to the demands of other road users being placed on the network. The outcome of this study will not only reduce the traffic congestion during peak hours but also improve the cyclists’ safety at a typical diamond interchange.
- ItemSignalized fuzzy logic for diamond interchanges incorporating with fuzzy ramp system : a thesis presented in partial fulfilment of the requirements for the degree of Master of Engineering in Mechatronics at Massey University, Auckland, New Zealand(Massey University, 2009) Pham, Cao VanNew dynamic signal control methods such as fuzzy logic and artificial intelligence developed recently mainly focused on isolated intersection. In this study, a Fuzzy Logic Control for a Diamond Interchange incorporating with Fuzzy Ramp System (FLDI) has been developed. The signalization of two closely spaced intersections in a diamond interchange is a complicated problem that includes both increasing the diamond interchange capacity and reduce delays at the same time. The model comprises of three main modules. The Fuzzy Phase Timing module controls the current phase green time extension, the Phase Selection module select the next phase based on the pre-defined phase sequence or phase logics and the Fuzzy Ramp module determines the cycle time of the ramp meter bases on current traffic volumes and conditions of the interchanges and the motorways. The developed FLDI model has been compared with the traffic actuated simulation with respects to flow rates and the average delays of the vehicles. The model of an actual diamond interchange is described and simulated by using AIMSUN (Advanced Interactive Microscopic Simulator for Urban and Non-Urban Network) software. Simulation results show the FLDI model outperformed the traffic actuated models with lower system total travel time, average delay and improvements in downstream average speed and average delay.