  • Item
    An optimisation process to motivate effective adoption of BIM for refurbishment of complex buildings in New Zealand
    (Higher Education Press Limited Company. Publishing services by Elsevier B.V. on behalf of KeAi Communications Co. Ltd., 2019-12) Okakpu A; GhaffarianHoseini A; Tookey J; Haar J; Ghaffarian Hoseini A
    Despite the multidisciplinary networks involved in refurbishment of complex building projects, the lack of BIM adoption signifies lack of real BIM benefits towards acceptance of BIM within Architecture, Engineering and Construction (AEC). To this end, this study empirically examines the potential real benefits between traditional network and BIM network for a real-time refurbishment case study project, through agent-based simulation modelling. A social network analysis theory is adapted to model the project interaction networks and a BIM prototype network. An assessment of the main stakeholders for BIM perception is carried out. We offered three prototype interaction networks for comparison of real BIM benefit. An agent-based Bayesian network model is used to simulate the propagation of design error within the project networks. The result of the analysis show that BIM project diffuses error efficiently, while stakeholders recovers faster and nearly at the same time than traditional network. The optimised network shows better performance to the traditional network, when there is early involvement of subcontractors. The main contribution of this study is providing a novel approach to compare real benefits for traditional method to BIM method for refurbishment project and to provide avenue for project stakeholders to optimise their interaction through adoption of BIM.
  • Item
    A rank order of determinants of construction organisation's performance in New Zealand
    (Massey University, 2020) Alqudah HE; Poshdar M; Tookey J; Rotimi JOB
  • Item
    Evaluating defect reporting in new residential buildings in New Zealand
    (MDPI AG, Basel, Switzerland, 2015) Rotimi FE; Tookey J; Rotimi JO
    The need for defect reporting is becoming increasingly difficult to ignore at handover of new residential buildings. A general review in defect studies has consistently shown that newly built properties can be found to have a significant number of defects. Very often the responsibility for rectifying these common defects is borne by the new homeowner even though house developers are liable. In the current study, survey data is obtained from 216 recent home purchasers/owners across New Zealand urban cities. The intent of the investigation is to show that opportunities exist for defect reporting that will act as a mechanism to measure performance and thus improve the quality of finished construction products in New Zealand. The study found that a significant number (81%) of the participants were involved in the construction of their homes and could influence quality performance if they were proactive enough. The results show that (64.7%) did not engage the service of independent building inspectors for defect reporting on their new homes. Seventy-four percent now agree that independent building inspection was important in hindsight. The study findings are in line with literature on defects and the poor use of defect reporting in new residential buildings. The current challenge for defect rectification by house developers after handover is real and this could increase the confidence that new home owners can have in their developers. Defect reporting could confer benefits to new residential building quality in New Zealand and should be embraced as part of a wider best practice.