Massey Documents by Type
Permanent URI for this communityhttps://mro.massey.ac.nz/handle/10179/294
Browse
3 results
Search Results
Item Operation of an activated sludge plant for fellmongery wastewater treatment : a thesis submitted in partial fulfilment of the requirements of the degree of Master of Technology in Environmental Engineering at Massey University, Palmerston North, New Zealand(Massey University, 2000) Bourke, Christopher DenisActivated sludge is one of the most common wastewater-treatment processes used to reduce pollutant loads on the receiving environment. For efficient operation, there must be an effective process control and operation strategy in place to ensure that process problems are avoided. This research is a case study into the process control and operation of an activated sludge plant used for fellmongery wastewater treatment. Analysis of the pretreated fellmongery wastewater showed that it is characterised by high total and volatile suspended solids concentrations, and high organic nitrogen concentrations. The plant was experiencing frequent problems that were attributed to the high influent suspended solids load coupled with ineffective solids management. Operation of bench-scale simulations showed that solids retention time (SRT) control at 5 or 10 days will produce acceptable effluent suspended solids concentrations and soluble chemical oxygen demand (COD) removal. Soluble COD removal for both 5 and 10 days was high at 85 and 80 % respectively at a hydraulic retention time of 6.4 days. Effluent suspended solids concentrations were 100 and 157 g/m 3 respectively. A steady state control model was developed based on, mass balances of biochemical oxygen demand (BOD) and volatile suspended solids (VSS), process performance equations, and the solids retention time (SRT). The model used three control points, the clarifier underflow pump, the clarifier influent pump and the waste sludge pump. The model was incorporated into an off-line Activated Sludge Operation Program (ASOP) to provide a user-friendly interface between the plant and operator. The main output from ASOP includes values for the three control points and suggestions to help avoid problems. A process control and operation strategy was developed using ASOP, the knowledge gained in this research, and an operation manual developed from accepted operation practises.Item Tracer studies of a subsurface flow wetland : a thesis submitted in partial fulfilment of the requirements for the degree of Master of Technology in Environmental Engineering, Massey University(Massey University, 1996) Prasad, Julius NarendraThe use of constructed wetlands represents an innovative approach to wastewater treatment. However, the treatment performance of constructed wetlands has been variable due to an incomplete knowledge of the hydraulic characteristics. Current design methods idealise constructed wetlands as plug flow reactors ignoring the existence of longitudinal dispersion, short-circuiting and stagnant regions. The overall effect will be a reduction of treatment efficiency at the outlet. This thesis investigates the hydraulic characteristics of a subsurface flow wetland using a fluorescence dye tracer so as to determine the difference between theoretical and actual retention times and their effect on treatment efficiency. A thorough review of the literature is undertaken, firstly examining wetland systems and their treatment mechanisms, it then reviews their hydraulic characteristics and design considerations while finally discussing dye tracing studies. A series of dye tracing trials were undertaken on a pilot scale gravel bed wetland with a theoretical retention time of four days. The results from this research are presented as plots of dye concentration versus time at the outlet. These results are analysed in terms of chemical reactor theory and their implications on performance of various treatment mechanisms is discussed.Item COD removal and nitrification of piggery wastewater in a sequencing batch reactor : a thesis submitted in partial fulfilment of the requirements for the degree of Master of Technology in Environmental Engineering(Massey University, 1998) Wong, Wing NgaPiggery wastewaters are particularly problematic when released untreated into the environment. They contain high levels of chemical oxygen demand (COD) and also nutrients such as nitrogen and phosphorus which can cause eutrophication in surface waters. The sequencing batch reactor is a form of biological treatment in a completely mixed reactor with aerobic and anoxic periods to facilitate nutrient removal. In this study nitrogen removal of piggery wastewater in a SBR by nitrification and denitrification was investigated. Screened raw piggery effluent was used in this study. Average non filtered feed contained a chemical oxygen demand of 12,679 mg/l. The average of the non filtered feed TKN was 1103 mg/l with its largest component being ammonia having an average concentration of 681 mg/l (non filtered feed). Initial experiments with solids retention time (SRT) of 15 days and the hydraulic retention time (HRT) was 5 and 3.3 days for 9 and 4 weeks respectively during Stage 1. No significant nitrification activity was observed during this period. The reactor cycle time was then increased to 2 days which effectively increased the SRT to 30 days and HRT to 6.7 days (Stage 2). The new environment allowed the nitrifying population to develop and nitrification was observed with the formation of nitrite and nitrate. The heterotrophic kinetic constants determined the yield coefficient as 0.49. The maximum specific growth rate (μ max) was 6.8 day-1 and half saturation constant (Ks) was 293.6 mg/l. The COD removal of the feed in the SBR started from around 70% in weeks 6-10 during Stage 1 and reached 92.7% in week 29. Ammonia removal was not significant in the first 17 weeks due to no significant nitrification activity during that time. After initiating a 2 day reactor cycle, ammonia removal rates increased to over 90%. Batch tests indicated that most of the ammonia needed to be removed in the first aerobic period. This allows nitrite and nitrate concentrations to build up and be removed by the subsequent anoxic period. This was when there was enough readily degradable COD as not to inhibit denitrification. The reactor cycle time which achieved full nitrification and the highest nitrate removal by denitrification was observed in the batch test on day 256. The first 6 hour aerobic period removed 81.1% of the ammonia. Subsequent anoxic periods reduced the nitrate concentration in the effluent to 11.0 mg N/l. The nitrification rates increased in the reactor over time as the nitrifying population acclimatised to the piggery effluent. In fact the highest nitrate formation and ammonia oxidation rate was 15.5 mg N/l. h and 24.6 mg N/l.h measured during the last test on day 270. Nitrite formation rates peaked at 11.5 mg N/l.h. The SBR biomass population was able to remove nitrate efficiently as batch tests showed that denitrification rates could reach 22.1 mg N/l.h. The relationship between effluent nitrate levels and COD: ammonia concentration ratio was assessed in order to determine the importance of these chemical characteristics important in controlling the nitrification and denitrification activity in the SBR. Results showed that as the COD: ammonia concentration ratio increases, the effluent nitrate levels decreases. The study found that the SBR was suitable in removing COD and Nitrogen from piggery wastewater.
