Classification of rework root causes in the design stage of projects for contract assessment

dc.citation.issue4
dc.citation.volume1101
dc.contributor.authorAsadi R
dc.contributor.authorRotimi JOB
dc.contributor.authorWilkinson S
dc.coverage.spatialMelbourne, Australia
dc.date.accessioned2025-06-04T01:56:46Z
dc.date.available2025-06-04T01:56:46Z
dc.date.finish-date2022-06-30
dc.date.issued2022-01-01
dc.date.start-date2022-06-26
dc.description.abstractRework is one of the leading causes of cost and time overruns that primarily affect project performance. The performance of construction projects can be elevated with the implementation of rework moderation strategies. Identifying rework root causes is the first step of rework management followed by a mitigation approach, reducing or preventing strategy. As the contract is the core connection between clients and contractors, using a rework management approach in the contracting process allows participants to be aware of rework impacts before the project's commencement. Selecting the best approach for rework mitigation depends on rework causes and their classified roots. Thus, the paper classifies rework root causes in the design stage of projects to provide a platform for contract documents assessment. The method used to classify the identified rework causes into five categories was designed on the literature. Results from collecting secondary data indicated all categories in the design stage, consisting of technical, human resources, process, material/equipment, and other general factors. The next step of the study is to assess contract documents through a questionnaire based on these classified factors in search of a connection between rework, contractual claims, and clauses of the contract. The paper recommends that assessing contract documents can be used as a new approach for rework management.
dc.description.confidentialfalse
dc.format.pagination1-13
dc.identifier.citationAsadi R, Rotimi JOB, Wilkinson S. (2022). Classification of rework root causes in the design stage of projects for contract assessment. IOP Conference Series: Earth and Environmental Science. (pp. 1-13). IOP Publishing Ltd.
dc.identifier.doi10.1088/1755-1315/1101/4/042033
dc.identifier.eissn1755-1315
dc.identifier.elements-typec-conference-paper-in-proceedings
dc.identifier.issn1755-1307
dc.identifier.urihttps://mro.massey.ac.nz/handle/10179/72989
dc.publisherIOP Publishing Ltd
dc.publisher.urihttp://iopscience.iop.org/article/10.1088/1755-1315/1101/4/042033
dc.rights(c) 2022 The Author/s
dc.rightsCC BY 3.0
dc.rights.urihttps://creativecommons.org/licenses/by/3.0/
dc.source.journalIOP Conference Series: Earth and Environmental Science
dc.source.name-of-conferenceWorld Building Congress 2022
dc.titleClassification of rework root causes in the design stage of projects for contract assessment
dc.typeconference
pubs.elements-id458670
pubs.organisational-groupOther

Files

Original bundle

Now showing 1 - 1 of 1
Loading...
Thumbnail Image
Name:
458670 PDF.pdf
Size:
833.26 KB
Format:
Adobe Portable Document Format
Description:
Published version.pdf

License bundle

Now showing 1 - 1 of 1
Loading...
Thumbnail Image
Name:
license.txt
Size:
9.22 KB
Format:
Plain Text
Description: