• Login
    View Item 
    •   Home
    • Massey Documents by Type
    • Theses and Dissertations
    • View Item
    •   Home
    • Massey Documents by Type
    • Theses and Dissertations
    • View Item
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Totara Valley micro-hydro development : a thesis presented in partial fulfillment of the requirements for the degree of Master of Applied Science in Renewable Energy Engineering, Massey University, Palmerston North, New Zealand

    Icon
    View/Open Full Text
    Photographs (4.177Mb)
    Hydro Cost Model PC v0.xls (77.5Kb)
    Totara Valley Distributed Generation Project.ppt (1.789Mb)
    02whole.pdf (3.630Mb)
    01front.pdf (243.3Kb)
    Export to EndNote
    Abstract
    This study focuses on the design, construction and operation of a distributed generation system based on micro-hydro technology. The project is sited in the Totara Valley, a small rural community approximately 70km from the Massey University, Turitea campus, Palmerston North. The Massey University Centre for Energy Research (MUCER) has a long history of renewable energy research within the Totara Valley community. This project complements these existing schemes and provides a foundation for future research into distributed generation technologies. The project encompasses the following objectives: - to gain practical experience in the design, engineering and implementation of a distributed generation system in rural New Zealand; - to evaluate contemporary micro-hydro technology and compare the performance of this equipment in a theoretical and practical context; - to identify barriers that hinder the widespread adoption of micro-hydro systems in rural New Zealand; - to develop a spreadsheet based life cycle costing tool. The results from this study demonstrate that economic considerations are the fundamental aspect to be considered when assessing the long-term viability of these projects. The viability of micro-hydro projects are primarily determined by four factors: - the volume and head (height) of water available above the turbine site; - the length and therefore the cost of the pipeline required for transporting water to the turbine; - the legal and administrative costs involved in obtaining a resource consent to maintain access to the water resources; - the prices received and paid for electricity. Considerable charges were payable to the local authority to secure and maintain the right to harness the water resources at this site. This cost contributed considerable risk to the project and creates a significant barrier to establishing similar systems at other sites. The reduction of resource consent charges to levels that fairly reflect the negligible environmental impacts of these projects would encourage the adoption of this technology and deliver benefits to rural New Zealand communities.
    Date
    2008-11-06T02:08:07Z
    Author
    Donnelly, David Ronald
    Rights
    The Author
    Publisher
    Massey University
    URI
    http://hdl.handle.net/10179/695
    Collections
    • Theses and Dissertations
    Metadata
    Show full item record

    Copyright © Massey University
    Contact Us | Send Feedback | Copyright Take Down Request | Massey University Privacy Statement
    DSpace software copyright © Duraspace
    v5.7-2020.1
     

     

    Tweets by @Massey_Research
    Information PagesContent PolicyDepositing content to MROCopyright and Access InformationDeposit LicenseDeposit License SummaryTheses FAQFile FormatsDoctoral Thesis Deposit

    Browse

    All of MROCommunities & CollectionsBy Issue DateAuthorsTitlesSubjectsThis CollectionBy Issue DateAuthorsTitlesSubjects

    My Account

    LoginRegister

    Statistics

    View Usage Statistics

    Copyright © Massey University
    Contact Us | Send Feedback | Copyright Take Down Request | Massey University Privacy Statement
    DSpace software copyright © Duraspace
    v5.7-2020.1