• Login
    View Item 
    •   Home
    • Massey Documents by Type
    • Theses and Dissertations
    • View Item
    •   Home
    • Massey Documents by Type
    • Theses and Dissertations
    • View Item
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    The application of risk analysis tools in Civil Defence Emergency Management Planning in New Zealand : a thesis presented in partial fulfilment of the requirements for the degree of Masters of Philosophy in Emergency Management at Massey University

    Icon
    View/Open Full Text
    01_front.pdf (689.8Kb)
    01_whole.pdf (21.06Mb)
    Export to EndNote
    Abstract
    Civil Defence Emergency Management (CDEM) Groups were formed in New Zealand in response to the introduction of the CDEM Act in 2002. These Groups were required to prepare CDEM Group Plans within two years of their formation. These Group Plans were to be based on a risk management approach, and be consistent with a Director's Guideline issued by the Ministry of CDEM at the time the legislation was passed (MCDEM, 2002). The Director's Guideline recommended a process of risk analysis called the SMUG (Seriousness Manageability, Urgency and Growth) risk analysis tool. The tool was to provide CDEM Groups with a mechanism for a more detailed risk analysis process than a simple likelihood and consequence assessment as described in the Australian and New Zealand Risk Management Standard (AS/NZS 4360:1999). Most CDEM Groups in New Zealand implemented the SMUG (Seriousness, Manageability, Urgency & Growth) risk analysis technique, or adapted the model to suit their own requirements. The reported benefits of using the risk analysis technique included greater engagement of a range of agencies with a role in Civil Defence Emergency Management, and greater understanding of the risks faced by each CDEM Group. However the limitations of the technique included overreliance on the numerical rating system, inconsistencies of application of the model, lack of risk evaluation criteria, and difficulty of application. CDEM Groups must revise their CDEM Group Plans by 2010 and it is recommended that future approaches allow flexibility for the purpose of risk analysis to acknowledge different levels of understanding of risk in different parts of New Zealand, and continue to involve a large range of agencies in the analysis process. The focus of future risk analysis processes should be on the consequences of hazard events, rather than the hazards themselves. Also, future risk analysis processes should remain qualitative if this is necessary to prevent CDEM Groups becoming over-reliant on numerical rating systems which convey a sense of accuracy often not proportional to the data upon which the analysis was conducted. Measurements of community vulnerability and resilience should also be incorporated into future CDEM Group risk analysis processes.
    Date
    2006
    Author
    Cunningham, Deborah Joy
    Rights
    The Author
    Publisher
    Massey University
    URI
    http://hdl.handle.net/10179/7087
    Collections
    • Theses and Dissertations
    Metadata
    Show full item record

    Related items

    Showing items related by title, author, creator and subject.

    • Icon
      Title:
      A structured approach for integrated emergency management planning and response for pre-declaration emergencies : a thesis presented in partial fulfillment of the requirements for the degree of Master of Philosophy in Emergency Management, 130.899 at Massey University, Palmerston North, New Zealand 
      Author:
      Raine, Christopher Taylor; Raine, Christopher Taylor
      Date:
      2006
    • Icon
      Title:
      Local government emergency management : emergency operations centres, training and decision making : a thesis presented in partial fulfilment of a Masters in Emergency Management at Massey University, Wellington, New Zealand 
      Author:
      Sinclair, Helen; Sinclair, Helen
      Date:
      2011
    • Icon
      Title:
      Emergency management response to landslide dams following the 2016 Kaikoura earthquake : a thesis presented in partial fulfilment of the requirement for the degree of Masters in Emergency Management at Massey University, Wellington, New Zealand 
      Author:
      Swatton, Lucinda Emily Marlene
      Date:
      2018

    Copyright © Massey University
    Contact Us | Send Feedback | Copyright Take Down Request | Massey University Privacy Statement
    DSpace software copyright © Duraspace
    v5.7-2020.1
     

     

    Tweets by @Massey_Research
    Information PagesContent PolicyDepositing content to MROCopyright and Access InformationDeposit LicenseDeposit License SummaryTheses FAQFile FormatsDoctoral Thesis Deposit

    Browse

    All of MROCommunities & CollectionsBy Issue DateAuthorsTitlesSubjectsThis CollectionBy Issue DateAuthorsTitlesSubjects

    My Account

    LoginRegister

    Statistics

    View Usage Statistics

    Copyright © Massey University
    Contact Us | Send Feedback | Copyright Take Down Request | Massey University Privacy Statement
    DSpace software copyright © Duraspace
    v5.7-2020.1