Biological phosphorus removal from a phosphorus rich dairy processing wastewater : a thesis presented in partial fulfilment of the requirements for the degree of Doctor of Philosophy in Environmental Engineering at Massey University, Turitea Campus, Palmerston North, New Zealand

dc.contributor.authorBickers, Paul O.
dc.date.accessioned2010-08-17T23:22:03Z
dc.date.availableNO_RESTRICTIONen_US
dc.date.available2010-08-17T23:22:03Z
dc.date.issued2005
dc.description.abstractA phosphorus rich wastewater, typical of a dairy processing site producing milk powder, was biologically treated in a continuous activated sludge reactor. A literature review indicated there was a vast amount of information on the mechanisms of the Enhanced Biological Phosphorus Removal (EBPR) process and its application to domestic wastewaters, but little successful research on its application to dairy processing wastewater. The biodegradability of the wastewater organic fractions was assessed due to their impact on the EBPR process. Continuous anaerobic fermentation tests were used to determine the concentration of volatile fatty acids that could be generated, as these are required for successful EBPR. A fermenter hydraulic retention time of 12 hours and a temperature of 35 °C generated the highest concentration of volatile fatty acids, with an acidification rate of 65% (based on 0.45µm filtered COD). To permit improved dissolved oxygen control and increased flexibility, a multi-zone reactor was designed. A fermentation stage was also incorporated prior to the activated sludge reactor. This reactor was operated with anaerobic, anoxic and aerobic zones at an SRT of 10 days and stable biological phosphorus removal was achieved. A maximum of 41.5 mg P/L was removed and phosphorus release and PHA storage occurred in both the anaerobic and anoxic zones. The soluble COD consumed in the unaerated zones (anaerobic + anoxic) totalled 484 mg COD/L on the day of the zone study (day 158). The aerobic sludge phosphorus concentration averaged 7.0% mg P/mg VSS after system optimisation. The anaerobic volume was doubled in order to increase the anaerobic consumption of volatile fatty acids. This change increased the amount of soluble COD consumption in the unaerated zones to 632 mg P/L after 40 days but did not result in a significant increase in biological phosphorus removal. In the next series of trials, the concentration of nitrogen in the wastewater was decreased and the anoxic zone removed. This change did not improve the amount of biological phosphorus removal, which was 35 mg P/L at an SRT of 10 days. The effect of different sludge retention times was then investigated. Increasing the SRT to 15 days resulted in little change in phosphorus removal (34.5 mg P/L). Decreasing the SRT to 5 days resulted in the loss of EBPR. The medium term effect on the EBPR process by removing the fermentation stage was also assessed using an AO configuration at an SRT of 10 days. The amount of phosphorus removed decreased slightly after 34 days to 34 mg P/L, but the soluble COD consumed in the anaerobic zone increased to 624 mg P/L. It was concluded that a stable EBPR process could be established when treating a dairy processing wastewater with a continuous activated sludge reactor. The biological stability was sensitive to changes in the solids retention time and the removal of the fermentation stage.en_US
dc.identifier.urihttp://hdl.handle.net/10179/1562
dc.language.isoenen_US
dc.publisherMassey Universityen_US
dc.rightsThe Authoren_US
dc.subjectDairy wasteen_US
dc.subjectActivated sludge reactoren_US
dc.subject.otherFields of Research::290000 Engineering and Technology::291100 Environmental Engineering::291102 Bio-remediationen_US
dc.titleBiological phosphorus removal from a phosphorus rich dairy processing wastewater : a thesis presented in partial fulfilment of the requirements for the degree of Doctor of Philosophy in Environmental Engineering at Massey University, Turitea Campus, Palmerston North, New Zealanden_US
dc.typeThesisen_US
massey.contributor.authorBickers, Paul O.
thesis.degree.disciplineEnvironmental Engineeringen_US
thesis.degree.grantorMassey Universityen_US
thesis.degree.levelDoctoralen_US
thesis.degree.levelDoctoralen
thesis.degree.nameDoctor of Philosophy (Ph.D.)en_US
Files
Original bundle
Now showing 1 - 2 of 2
Loading...
Thumbnail Image
Name:
02_whole.pdf
Size:
6.58 MB
Format:
Adobe Portable Document Format
Description:
Loading...
Thumbnail Image
Name:
01_front.pdf
Size:
1.12 MB
Format:
Adobe Portable Document Format
Description:
License bundle
Now showing 1 - 1 of 1
Loading...
Thumbnail Image
Name:
license.txt
Size:
895 B
Format:
Item-specific license agreed upon to submission
Description: