Risk identification, assessment, and allocation in PPP projects: A systematic review
dc.citation.issue | 1109 | |
dc.citation.volume | 12 | |
dc.contributor.author | Rasheed N | |
dc.contributor.author | Shahzad W | |
dc.contributor.author | Khalfan M | |
dc.contributor.author | Rotimi JOB | |
dc.date.available | 27/07/2022 | |
dc.date.issued | 27/07/2022 | |
dc.description.abstract | Public private partnerships (PPPs) have gained widespread adoption as an innovative way of procuring public infrastructure projects over the last two decades. Risk identification, assessment, and allocation have received considerable attention from researchers due to the risk heavy nature of PPP projects. Adoption of PPPs has triggered a sudden increase in research interest in the area in recent years. This study attempts to provide an updated systematic review of literature related to risks in PPPs using a PRISMA flowchart. The results of the study offer some valuable insights into the future and current state of research. The study found that the focus of research on PPPs has shifted from an overall risk identification and assessment approach to individual risk analysis. Moreover, this research trend is on the rise in developing countries, and that quantitative methods for risk management in PPP research and qualitative methods in practice are preferred. In developed economies, due to negative public sentiments, transparency concerns, and arguments of value for money not being achieved, PPPs are becoming less popular. For these reasons a shift to availability-based payment mechanisms such as in Design-Build-Finance-Maintain (DBFM) from traditional revenue-based mechanisms as in Build-Operate-Transfer (BOT) has been observed. These shifts in research trends and practice offer researchers future opportunities to investigate these relatively newer approaches. | |
dc.description.confidential | FALSE | |
dc.format.extent | 1 - 19 (19) | |
dc.identifier | https://doi.org/%2010.3390/buildings12081109 | |
dc.identifier.citation | Buildings, 2022, 12 (1109), pp. 1 - 19 (19) | |
dc.identifier.doi | 10.3390/buildings12081109 | |
dc.identifier.elements-id | 454889 | |
dc.identifier.harvested | Massey_Dark | |
dc.identifier.issn | 2075-5309 | |
dc.identifier.uri | https://hdl.handle.net/10179/17434 | |
dc.publisher | MDPI AG | |
dc.publisher.uri | https://doi.org/%2010.3390/buildings12081109 | |
dc.relation.isPartOf | Buildings | |
dc.relation.uri | https://www.mdpi.com/2075-5309/12/8/1109 | |
dc.subject.anzsrc | 1201 Architecture | |
dc.subject.anzsrc | 1202 Building | |
dc.subject.anzsrc | 1203 Design Practice and Management | |
dc.title | Risk identification, assessment, and allocation in PPP projects: A systematic review | |
dc.type | Journal article | |
pubs.notes | Not known | |
pubs.organisational-group | /Massey University | |
pubs.organisational-group | /Massey University/College of Sciences | |
pubs.organisational-group | /Massey University/College of Sciences/School of Built Environment |
Files
Original bundle
1 - 1 of 1
Loading...
- Name:
- 2022 BUILDINGS NR.pdf
- Size:
- 13.15 MB
- Format:
- Adobe Portable Document Format
- Description: