    Benefits, constraints and enablers of modular offsite construction (MOSC) in New Zealand high-rise buildings
    (Emerald, 2023) Shahzad WM; Reddy SM; Kahandawa R; Rotimi JOB
    Purpose: The ascendancy of modular offsite construction (MOSC) over traditional construction methods is well known. Despite the known potential of this construction approach, its adoption is minimal in New Zealand construction industry. This article investigates the potential benefits of using MOSC for delivery of high-rise buildings in New Zealand, underlying factors responsible for its low uptake and the measures that can facilitate its improved uptake. Design/methodology/approach: This study utilised a mixed research approach. An empirical questionnaire survey was carried out with New Zealand construction industry professionals with expertise in MOSC. Factor analysis of survey data was carried out using SPSS software. Semi-structured interviews were carried out with subject matter experts to get further insights and expand the survey findings. Interview data were analysed using thematic analysis. Findings: Study identified benefits of MOSC, thus establishing potential of its uptake for high-rise building construction. Constraining factors were investigated, most pronounced being low level of skills in construction industry to design, manufacture and integrate supply chain of MOSC, high initial investment, high cost of importing modules and negative perception about offsite manufactured buildings. This study also highlighted the enablers to improve uptake of MOSC. These enablers included; loan and mortgage policies to suit MOSC paradigm, building regulations to support OSC industry, increased support from the government and awareness and acceptance of standardised building designs among the clients. Originality/value: Originality of this paper harps from little to no research carried out to investigate use of MOSC for high-rise buildings in New Zealand context.
  • Item
    Lean and BIM Implementation Barriers in New Zealand Construction Practice
    (MDPI AG, 2022) Likita AJ; Jelodar MB; Vishnupriya V; Rotimi JOB; Vilasini N
    The construction sector is lagging behind other industries in terms of efficiency and value achievement. Several building sector initiatives are introduced to improve productivity and project value enhancement. Significant developments such as Lean principles and BIM tools have been applied in the construction sector to achieve efficiency and enhanced productivity while minimizing waste. Lean principles in construction practice are a developing research area, and BIM tools have been widely used in construction project delivery and communications. Although these concepts are beneficial, barriers to their integration and joint implementation have not previously been explored. The paper investigates barriers to implementing Lean and BIM and their interrelationships in the New Zealand construction industry. A three-step triangulation methodology was used in the study to validate the findings. The study used an extensive literature review process, case studies, and expert interviews to consolidate the findings. Barriers to Lean and BIM implementation in construction practice were identified, which include strong cultural resistance, lack of Lean-BIM understanding, resistance to change, lack of knowledge of the Lean-BIM method, and lack of support from senior staff in New Zealand organizations. The effect of implementing Lean-BIM principles is discussed, as are recommendations for implementing the method in construction practice.
  • Item
    Causes of payment problems in the New Zealand construction industry
    (University of Technology Sydney (UTS) ePress, 2015) Ramachandra T; Rotimi JOB
    Payment delays and losses persist in the construction industry and continue to be a key concern to industry practitioners. Therefore an exploration of the key causes of payment delays and losses is undertaken in this study with the ultimate objective of seeking mitigating solutions. The study adopted a survey approach using an online questionnaire, administered to practitioners from the New Zealand construction industry, comprising consultants, head contractors and subcontractors. The data obtained was analysed using inferential statistical techniques, including comparing means and factor analysis. Factor analysis enabled clustering of the inter-related causes of payment delays and losses in order to find reduced number of causes. Accordingly, the study found that payment problems mainly relate to contractual issues, financial strength of industry players, disputes, short-comings of payment processes and ‘domino effects’. Among them, the financial strength of critical industry players was considered central to payment problems. The study concludes that any solution to these problems must address these primary causes, as a rational starting point. Thus procuring a feasible form of financial security at the outset of a project, and the pre-qualification of the financial status of critical project participants, were found to be significant in the mitigation of construction payment risks
  • Item
    Moderating effect of equity sensitivity on behavior-outcome relationships in construction dispute negotiation
    (1/05/2011) Yiu TW; Law YM
    This study builds on Adam's equity theory by examining the moderating effects of equity sensitivity (i.e., a person's perception of what is equitable or inequitable) on behavior-outcome relationships among negotiators in construction dispute negotiation. First, an equity sensitivity construct is developed. This construct reveals that most construction negotiators are entitleds, also known as takers, at the negotiation table. Moderated multiple regression (MMR) is used to test the moderating effects of equity sensitivity. The MMR models affirm that the nature of behavior-outcome relationships varies, depending on the perception of equity. An entitled construction negotiator is found to be a versatile moderator who fosters satisfactory negotiation outcomes. The models show that negotiators are able to predict inequitable responses and to take measures to forestall or deal with different inequitable situations. This study indicates the merit of further study of equity theory in the context of construction dispute negotiation. Future challenges in this area include the examination of the equity restoration responses of negotiators to create an equitable environment. © 2011 American Society of Civil Engineers.
  • Item
    Does leadership style differ between a post-disaster and non-disaster response project? A study of three major projects in New Zealand
    (MDPI (Basel, Switzerland), 2019-09) Witton F; Rasheed EO; Rotimi JOB
    Purpose–The leadership styles of three major infrastructure projects within New Zealand were determined and comparatively analysed to ascertain whether the leadership style employed in a post-disaster recovery project would differ significantly from a normal infrastructure project. A multifactor leadership questionnaire was administered to project leaders and personnel of the three infrastructure projects. The statistically significant differences (p < 0.05) in leadership styles were determined using one-way ANOVA analytical tool in STATISTICA 13. Results showed all three projects have strong transformational and transactional leadership traits. There were similarities in leadership style amongst the projects. None of the projects had a significant laissez-faire leadership style. Hence there is no significant difference in leadership style between a disaster recovery project and a normal project. Plausible reasons and implications are provided to support these findings. This study provides insight into leadership styles employed in projects in New Zealand, which could assist in the decision-making process for new and existing projects. Future studies could investigate the effect a combination of leadership styles will have on project success and staff retention. More studies are required across New Zealand to verify the generalizability of the current study findings.
  • Item
    Application of equity sensitivity theory to problem-solving approaches in construction dispute negotiation
    (1/01/2011) Yiu TW; Keung CW; Wong KL
    This study applies equity sensitivity theory to investigate how the sensitivity of negotiators to perceived equity or inequity varies with their perception of the adoption of problem-solving approaches (PSAs) in negotiation in the construction industry. Drawing upon this theory, we identify three classes of negotiators: benevolents (known as "givers"), equity sensitives, and entitleds (known as "takers"). Our results suggest that most of the negotiators in our sample are entitleds. The study also provides statistical evidence that the perception of the adoption of PSAs appears to be associated with the degree of equity sensitivity of negotiators. For instance, benevolents demonstrate a significantly stronger preference for the adoption of PSAs and are thus able to obtain a higher level of negotiation satisfaction compared to the other types of negotiators. These findings are particularly relevant to the corporate managers of construction organizations, who may want to consider the inherent equity sensitivity traits of their negotiators before sending them to the negotiating table. © 2011 ASCE.
  • Item
    Towards Effective Implementation of Carbon Reduction Strategies in Construction Procurement: A Case Study of New Zealand
    (MDPI AG, 30/09/2022) He P; Bui TTP; Shahzad W; Wilkinson S; Domingo N
    In light of climate change, the construction industry plays a crucial part in alleviating carbon emissions and other environmental impacts. The focus on improving the public procurement process poses an important opportunity for the successful implementation of carbon reduction strategies in construction projects. There is a growing body of literature mapping green and sustainable procurement practices in construction. However, previous studies have not treated the implementation of procurement in a particular area, such as carbon reduction, in much detail. This study aims to investigate the implementation of construction procurement incorporating carbon reduction strategies, with a specific focus on the public sector in New Zealand. The research was conducted through 13 semi-structured interviews with construction procurement experts in New Zealand. The results shed light on the current implementation of carbon reduction strategies in construction procurement and its challenges, such as a lack of knowledge and ambiguous procurement guidelines and documents. It also emphasises the importance of (1) well-developed carbon reduction evaluation criteria, (2) specifying a budget for carbon-related initiatives, and (3) the prerequisite of a high level of innovation in the procurement document. The study adds to the rapidly expanding field of carbon reduction construction procurement by providing a deeper insight into the way carbon reduction strategies are effectively implemented in the procurement process.
  • Item
    Do Green Buildings Have Superior Performance over Non-Certified Buildings? Occupants’ Perceptions of Strengths and Weaknesses in Office Buildings
    (MDPI AG, 25/08/2022) Khoshbakht M; Rasheed E; Baird G
    The main objectives of green buildings are to improve their design and operation. Many studies have investigated whether green buildings lead to higher occupant satisfaction, yet with contradictory conclusions. The paper builds on the results of post-occupancy evaluation surveys of 68 buildings using the BUS Methodology. Satisfaction scores expressed by occupants with the qualities of their indoor environment were compared between the green and non-certified buildings. This research investigates whether green buildings have superior performance to non-certified buildings from the occupants’ perspectives. It was found that generally occupants were more satisfied in green buildings than in non-certified buildings. However, the differences were not significant for any of the environmental and operational parameters including thermal comfort, lighting, noise, and air quality. In the case of operational parameters such as design, needs, image of the building, and cleaning, the differences between the two building groups were notable. Air quality, design and work requirement had the strongest influence on perceived comfort in both green and non-certified buildings. Noise had the strongest influence on perceived productivity for both building groups. Although overall green buildings performed better than the non-certified buildings, the differences between the two were negligible particularly for environmental parameters. Most of the green buildings were not performing entirely as their designers may have intended and had weaknesses that needed to be addressed.
  • Item
    Catastrophic transitions of construction contracting behavior
    (24/11/2008) Cheung SO; Yiu TW; Leung AYT; Chiu OK
    The ways to manage a construction project very much depend on the attitude of the people involved. Collectively this is identified as construction contracting behavior (CCB). The CCB of the construction industry is adversarial as pinpointed in many industry-wide reviews. A more cooperative project delivery approach has therefore been advocated. In fact, drive for efficiency provides the incentive for cooperation. Nevertheless, members of a project team, in representing their respective organizations, are often in conflict. The dichotomous pair of cooperation and aggression forces therefore coexist. It is not uncommon to note that CCB turns aggressive as the construction activities of a project intensify. This change is often sudden and thus matches well with the phenomenon of hysteresis described by the catastrophe theory (CT). It is hypothesized that the dynamics of CCB can be modeled by CT. The three-variable CT models include CCB (as dependent variable), cooperation forces (as normal factor) and aggression forces (as splitting factor). With data collected from a survey fitted by the Cuspfit program, it was found that trust intensity is an effective normal factor. Contract incompleteness and competitive inertia are splitting factors that trigger aggression. © 2008 ASCE.
  • Item
    Exploratory factors influencing building development costs in New Zealand
    (MDPI AG, 29/06/2017) Zhao L; Mbachu JIC; Domingo N
    Identification of costs drivers and their influence levels on building development costs plays a key role in the development of construction models and improve the efficiency and effectiveness of any project. Forty-five indicators influencing building development costs in New Zealand were explored by literature review and pilot interviews. These indicators were grouped into seven categories. The determination and ranking of the significant cost drivers were carried out through questionnaire survey distributed to key professionals working in New Zealand construction industry. Structural equation modeling (SEM) was used in analysing the empirical data. Findings showed that the property market, construction industry characteristics, statutory and regulatory, and socio-economic factors were major drivers of the building development cost trends in New Zealand. It was recommended that the ever-increasing building development costs and housing unaffordability in New Zealand could be significantly mitigated by addressing the identified factors.