Journal Articles

Permanent URI for this collectionhttps://mro.massey.ac.nz/handle/10179/7915

Browse

Search Results

Now showing 1 - 10 of 10
  • Item
    Benefits, constraints and enablers of modular offsite construction (MOSC) in New Zealand high-rise buildings
    (Emerald, 2023) Shahzad WM; Reddy SM; Kahandawa R; Rotimi JOB
    Purpose: The ascendancy of modular offsite construction (MOSC) over traditional construction methods is well known. Despite the known potential of this construction approach, its adoption is minimal in New Zealand construction industry. This article investigates the potential benefits of using MOSC for delivery of high-rise buildings in New Zealand, underlying factors responsible for its low uptake and the measures that can facilitate its improved uptake. Design/methodology/approach: This study utilised a mixed research approach. An empirical questionnaire survey was carried out with New Zealand construction industry professionals with expertise in MOSC. Factor analysis of survey data was carried out using SPSS software. Semi-structured interviews were carried out with subject matter experts to get further insights and expand the survey findings. Interview data were analysed using thematic analysis. Findings: Study identified benefits of MOSC, thus establishing potential of its uptake for high-rise building construction. Constraining factors were investigated, most pronounced being low level of skills in construction industry to design, manufacture and integrate supply chain of MOSC, high initial investment, high cost of importing modules and negative perception about offsite manufactured buildings. This study also highlighted the enablers to improve uptake of MOSC. These enablers included; loan and mortgage policies to suit MOSC paradigm, building regulations to support OSC industry, increased support from the government and awareness and acceptance of standardised building designs among the clients. Originality/value: Originality of this paper harps from little to no research carried out to investigate use of MOSC for high-rise buildings in New Zealand context.
  • Item
    Real options analysis of revenue risk sharing in post-disaster housing reconstruction
    (Emerald, 2021) Vahdatmanesh M; Firouzi A; Rotimi JOB
    Purpose: Post-disaster housing reconstruction (PDHR) demands a considerable percentage of global property investment, yet the post-disaster environment presents intricate challenges to reconstruction financing for governments and at the same time, revenue uncertainty for private investors. The purpose of this study is to develop a methodology for tackling land shortage and the financial challenges of PDHR in the aftermath of a disaster. Design/methodology/approach: This study developed a methodology based on a combined minimum revenue guarantee and maximum revenue cap model using a well-established real options analysis (ROA) for revenue risk sharing in PDHR projects and land readjustment (LR) for finance. The applicability of the purported model is demonstrated through an illustrative example. Findings: The results show that flexibility in the options could increase the PDHR contractor’s risk profile by increasing the expected value of the contractor investment and reducing the probability of investment loss. On the other side, a cap on the contractor revenue stream would allow the government to benefit from any excess in revenue and would counterbalance the value of the option. Practical implications: The framework proposed in this study could serve as a practical risk-revenue sharing in PDHR projects. Governments and policymakers could use the findings to enable the successful delivery of PDHR projects and consequently bring the quality of life of affected people to pre-disaster conditions. Originality/value: This study can be considered as a first attempt toward the use of the Australian barrier style options structure, and the trinomial lattice valuation model in PDHR projects, which incorporates LR, public-private partnerships, governmental guarantees and PDHR concepts in one ROA-based framework.
  • Item
    The primacy of as-built drawings in the management of underground utility operations: A New Zealand study
    (MDPI AG, 2021) Maree S; Rotimi FE; Rotimi JOB
    There are increasing incidences of damages to underground utilities and services during maintenance and construction works. These have posed significant challenges to utility owners regarding the magnitude and costs associated with remediation works. Therefore, this study inves-tigates the management activities for underground utility maintenance works in New Zealand to establish the significance of as-built drawings as a mitigator of these challenges. Data for the analysis was obtained through a questionnaire survey of asset owners, consultants, and contractors based in three major city centres in New Zealand. The responses are analysed descriptively and inferentially for ease of understanding of the study findings. The findings established the challenges around the as-built records, which were significant to utility damages during construction operations in New Zealand. The study participants highlighted other factors such as poor project management, site records, communication, excavation operator competencies, and inadequate site inventory. Generally, more investment in asset documentation is recommended for asset owners. Innovative approaches to information capture, monitoring and updating of as-built drawings are also suggested to improve on current routine processes. Other solutions relate to skills acquisition and development in the management of underground utility maintenance projects.
  • Item
    Does leadership style differ between a post-disaster and non-disaster response project? A study of three major projects in New Zealand
    (MDPI (Basel, Switzerland), 2019-09) Witton F; Rasheed EO; Rotimi JOB
    Purpose–The leadership styles of three major infrastructure projects within New Zealand were determined and comparatively analysed to ascertain whether the leadership style employed in a post-disaster recovery project would differ significantly from a normal infrastructure project. A multifactor leadership questionnaire was administered to project leaders and personnel of the three infrastructure projects. The statistically significant differences (p < 0.05) in leadership styles were determined using one-way ANOVA analytical tool in STATISTICA 13. Results showed all three projects have strong transformational and transactional leadership traits. There were similarities in leadership style amongst the projects. None of the projects had a significant laissez-faire leadership style. Hence there is no significant difference in leadership style between a disaster recovery project and a normal project. Plausible reasons and implications are provided to support these findings. This study provides insight into leadership styles employed in projects in New Zealand, which could assist in the decision-making process for new and existing projects. Future studies could investigate the effect a combination of leadership styles will have on project success and staff retention. More studies are required across New Zealand to verify the generalizability of the current study findings.
  • Item
    Lean and BIM Implementation Barriers in New Zealand Construction Practice
    (MDPI AG, 2022) Likita AJ; Jelodar MB; Vishnupriya V; Rotimi JOB; Vilasini N
    The construction sector is lagging behind other industries in terms of efficiency and value achievement. Several building sector initiatives are introduced to improve productivity and project value enhancement. Significant developments such as Lean principles and BIM tools have been applied in the construction sector to achieve efficiency and enhanced productivity while minimizing waste. Lean principles in construction practice are a developing research area, and BIM tools have been widely used in construction project delivery and communications. Although these concepts are beneficial, barriers to their integration and joint implementation have not previously been explored. The paper investigates barriers to implementing Lean and BIM and their interrelationships in the New Zealand construction industry. A three-step triangulation methodology was used in the study to validate the findings. The study used an extensive literature review process, case studies, and expert interviews to consolidate the findings. Barriers to Lean and BIM implementation in construction practice were identified, which include strong cultural resistance, lack of Lean-BIM understanding, resistance to change, lack of knowledge of the Lean-BIM method, and lack of support from senior staff in New Zealand organizations. The effect of implementing Lean-BIM principles is discussed, as are recommendations for implementing the method in construction practice.
  • Item
    Causes of payment problems in the New Zealand construction industry
    (University of Technology Sydney (UTS) ePress, 2015) Ramachandra T; Rotimi JOB
    Payment delays and losses persist in the construction industry and continue to be a key concern to industry practitioners. Therefore an exploration of the key causes of payment delays and losses is undertaken in this study with the ultimate objective of seeking mitigating solutions. The study adopted a survey approach using an online questionnaire, administered to practitioners from the New Zealand construction industry, comprising consultants, head contractors and subcontractors. The data obtained was analysed using inferential statistical techniques, including comparing means and factor analysis. Factor analysis enabled clustering of the inter-related causes of payment delays and losses in order to find reduced number of causes. Accordingly, the study found that payment problems mainly relate to contractual issues, financial strength of industry players, disputes, short-comings of payment processes and ‘domino effects’. Among them, the financial strength of critical industry players was considered central to payment problems. The study concludes that any solution to these problems must address these primary causes, as a rational starting point. Thus procuring a feasible form of financial security at the outset of a project, and the pre-qualification of the financial status of critical project participants, were found to be significant in the mitigation of construction payment risks
  • Item
    Impact of social media usage on performance of construction businesses (CBs) in Abuja-Nigeria
    (Emerald Publishing Limited, 27/07/2021) Oyewobi LO; Olorunyomi OS; Jimoh RA; Rotimi JOB
    Purpose Many construction businesses are currently building and keeping social media pages for their enterprises to be visible to the public to improve their social interaction, promote business interest, build trust and relationships with their targeted audience on social media. The purpose of this study is to examine the impact of social mediausage on performance of construction businesses (CBs) in Abuja, Nigeria. Design/methodology/approach This study used a quantitative research approach by identifying constructs that reveal three aspects of organisation’s physiognomies that impact the process of espousing, implementing and using technological innovations in conducting businesses. Well-structured questionnaire was used to obtain data from 113 purposively sampled building materials’ merchant operating in Dei-Dei Market, Abuja, Nigeria. This study used partial least squares structural equation modelling technique to establish the relationship among the constructs. Findings The results of this study indicated that technology has significant relationship with social media adoption, whereas social media adoption has a very strong positive impact on organisation’s performance (P < 0.001) with respect to improved customer relations and services and enhanced information accessibility. Research limitations/implications This study has implications for CBs that wish to adopt social media to promote their businesses by presenting to them the opportunity to understand the impact of technology, environment and organisational potential in improving business performance. This study is cross-sectional in nature, and this calls for caution in interpreting the results. Originality/value This paper developed and tested a conceptual framework presented to understand the interrelationships amongst the constructs, which would be of great significance to business owners in developing their social interaction and promote business interest via social media. The outcome of this research is beneficial to researchers to further study how the different social media tools could help in influencing business decisions.
  • Item
    Migrant construction workers’ demography and job satisfaction: A New Zealand study
    (Emerald, 2021) Rotimi JOB; Ramanayaka C; Olatunji O; Rotimi FE
    Purpose: The demand for construction-related occupations has increased consistently over many years in New Zealand (NZ). This has necessitated recourse to migrant workers to address capacity and capability requirements. Migrant construction workers hail from various backgrounds with a complex set of their needs being met through employment in NZ. Research on understanding the satisfaction levels of this category of construction workers is scarce. With recent insinuations about migrant exploitations, research investigations into this knowledge area are significant. In this study, the authors sought to establish the moderating effect of migrants' demography on the determinants of job satisfaction in NZ's construction sector. Design/methodology/approach: Data were obtained from migrant construction workers of Chinese extraction through a structured questionnaire survey. From 200 questionnaires administered, 108 samples were completed by migrant construction workers involved in major projects in Auckland city, NZ. Data obtained were analysed using descriptive and inferential statistics to establish the moderating effects of their demography on job satisfaction. Findings: Results from this study support the internal validity and reliability of these personal characteristics as moderators of job satisfaction for migrant construction workers. These results suggest the relevance of personal characteristics of Chinese migrants in any improvement initiatives being developed for this group of construction workers. Research limitations/implications: The findings from this study contribute to the discourse on the relevance of construction migrants as a strategic alternative to addressing skill shortages within the NZ construction sector. They also provide evidence that contributes to an improved understanding of the migrant workforce to meet their aspirations and enhance their general well-being. Originality/value: Although the study is ethnic-specific, the conclusions show the relevance of personal characteristics in the experiences of construction migrant workers. The study is representative of the catchment of temporary migrant workers in the construction industry in NZ. The study provides insights for organisations employing migrants about putting in place appropriate measures to enhance their satisfaction levels. Finally, this study's findings may contribute to policy initiatives on the optimal categories of migrants engaged on construction activities to derive the maximum benefits for NZ.
  • Item
    A study of design change management for infrastructure development projects in New Zealand
    (MDPI AG, 19/09/2022) Wang R; Samarasinghe DAS; Skelton L; Rotimi JOB
    Design changes seem to be an inevitable part of engineering, procurement and construction EPC projects. Such changes create a need for a proactive approach to adjusting project scope, cost and time (the triple constraints) for efficiency and effectiveness in overall delivery. This study investigates the causes and implications of design changes in order to improve design change management practices. Data for the study were obtained through online interviews with New Zealand industry practitioners. Thematic analysis was used to collate the results into meaningful data. The study found that design changes were predominantly caused by clients’ inadequate strategic planning, insufficient attention to design, EPC contractors’ inadequate design ability, and on-site variations. There were three categories of such design changes: direct impact on the project, the reciprocal and complementary effect on stakeholders, and the far-reaching impact on the community. The study concludes by suggesting improvements, such as strengthening the integration of project teams to enhance design quality, strategic alignment of stakeholders at the planning stage, early contractor involvement (ECI) between the planning and design phases, and improving collaboration between design and construction teams. Further, a combination of high technical skills (e.g., design ability) and soft skills (can-do attitude, interpersonal skills, problem-solving skills, documentation skills, etc.) are needed to generate the desired improvement in design change management.
  • Item
    Risk identification, assessment, and allocation in PPP projects: A systematic review
    (MDPI AG, 27/07/2022) Rasheed N; Shahzad W; Khalfan M; Rotimi JOB
    Public private partnerships (PPPs) have gained widespread adoption as an innovative way of procuring public infrastructure projects over the last two decades. Risk identification, assessment, and allocation have received considerable attention from researchers due to the risk heavy nature of PPP projects. Adoption of PPPs has triggered a sudden increase in research interest in the area in recent years. This study attempts to provide an updated systematic review of literature related to risks in PPPs using a PRISMA flowchart. The results of the study offer some valuable insights into the future and current state of research. The study found that the focus of research on PPPs has shifted from an overall risk identification and assessment approach to individual risk analysis. Moreover, this research trend is on the rise in developing countries, and that quantitative methods for risk management in PPP research and qualitative methods in practice are preferred. In developed economies, due to negative public sentiments, transparency concerns, and arguments of value for money not being achieved, PPPs are becoming less popular. For these reasons a shift to availability-based payment mechanisms such as in Design-Build-Finance-Maintain (DBFM) from traditional revenue-based mechanisms as in Build-Operate-Transfer (BOT) has been observed. These shifts in research trends and practice offer researchers future opportunities to investigate these relatively newer approaches.